Rigging & Lifting Facility – 11 Pepperell Road
The DFB Group's rigging
& lifting facility, operated by Extreme East Rigging Services
Limited, consists of 10,000 ft2 of manufacturing and
warehouse space and is fully equipped with state-of-the-art
manufacturing and testing equipment. In addition, Extreme East
maintains a complete pull and load test facility that provides
certifications for all products, including a 40-foot test apparatus
with a maximum pull capacity of 200,000 lbs.